Day 43

Day 43

Repair Execution and Quality Control

维修施工与质量控制

今天工程逻辑:

approved repair method
→ prepare the work
→ control materials and workmanship
→ follow the specified procedure
→ inspect completed work
→ record deviations
→ verify repair quality

中文:

批准维修方案 → 准备施工 → 控制材料和施工质量 → 按程序施工 → 完工检查 → 记录偏差 → 验证维修质量

今天控制在 2~2.5小时


⓪ Day42 空白提取|5分钟

不要看昨天资料。

Day42主题:

工程逻辑:

英文语块:
1.
2.
3.

英文主干:
1.

完整句:

一级提示:

repair / scope / damage / cause / materials / options

二级提示:

repair scope
extent of damage
underlying cause
compatible with
repair options

今天目标

  • 主题:大概能说出来
  • 语块:2个
  • 主干:1个
  • 完整句:不强求

① Day42旧句提取|10分钟

中文 → 英文。

1

工程师在制定维修方案之前确定损伤范围。

参考

Engineers determine the extent of damage before developing the repair proposal.

2

维修方法应针对缺陷的根本原因。

参考

The repair method should address the underlying cause of the defect.

3

维修材料应与既有结构相容。

参考

Repair materials should be compatible with the existing structure.

4

工程师应把维修对既有结构的影响考虑进去。

参考

Engineers should take the impact of the repair on the existing structure into account.

5

工程师应在选择方法之前比较维修方案。

参考

Engineers should compare repair options before selecting a method.

记录:

完整:___/5
未完整:___句
主干救回:___/___
完整中文中转:___/5

② Anki|15分钟

今天主要复习 Day41–42:

  • inspection findings
  • further investigation
  • repair scope
  • extent of damage
  • underlying cause
  • compatible with the existing structure
  • take … into account

今天的新词暂时只认识,不立刻全制卡。


③ 发音专项|8分钟

今天重点词:

workmanship

施工质量 / 工艺质量

/ˈwɜːkmənʃɪp/

注意不是:

work + man + ship 三块分开硬读

整体:

WORK-mən-ship


quality control

质量控制

quality control

重音主要在:

QUALity conTROL


deviation

偏差;偏离

/ˌdiːviˈeɪʃən/


procedure

程序;施工程序

澳音大致:

/prəˈsiːdʒə/


compliance

符合性;合规性

/kəmˈplaɪəns/

工程语境:

compliance with the design
符合设计要求


④ 精听|12分钟

今天句子故意短一点。

Sentence 1

第一句

Repair work should follow the approved method.

慢速:

常速:

第一遍听完:

可能留下:

参考

repair work / follow / approved method

关键词:

参考

work / follow / method

主干:

参考

Repair work should follow the method.


Sentence 2

第二句

Any deviation should be recorded and assessed.

慢速:

常速:

可能留下:

参考

deviation / recorded / assessed

主干:

参考

Deviation should be recorded and assessed.

今天重点:

不要试图先完整翻成:

“任何偏差应该被……”

先抓:

deviation → recorded → assessed


⑤ 顺序词 → 关键词 → 英文主干|7分钟

今天专门降低句长,目标是把 0/3 拉回 2/3

1

第一句

Engineers inspect the completed repair before accepting the work.

顺序词:

参考

engineers / inspect / completed repair / accepting / work

关键词:

参考

engineers / inspect / repair

主干:

参考

Engineers inspect the repair.


2

第二句

Repair materials should comply with the approved specification.

关键词:

参考

materials / comply / specification

主干:

参考

Repair materials should comply with the specification.

这里不能写:

materials should comply

因为:

comply with what?


3

第三句

Good workmanship is essential for long-term repair performance.

关键词:

参考

workmanship / essential / performance

主干:

参考

Good workmanship is essential.

稍微保留工程意义:

参考

Good workmanship is essential for repair performance.

记录:

顺序:___/3
关键词:___/3
主干:___/3
完整中文中转:___/3

Day43目标

顺序 2/3
关键词 2/3
主干至少 2/3

今天这一项比完整句重要。


⑥ 句子主干训练|15分钟

今天继续练:

必要补足信息不能乱删。

练习1

Engineers check the repair materials before starting the work.

填写:

  • 主语:
  • 谓语:
  • 宾语:
  • before starting the work
  • 主干:

练习2

The contractor should follow the approved repair procedure.

  • 主语:
  • 谓语:
  • 宾语:
  • approved修饰:
  • 主干:

练习3

Repair materials that do not comply with the specification should not be used.

  • 主语:
  • that是什么从句:
  • that指代:
  • 从句谓语:
  • with the specification是什么:
  • 主句谓语:
  • 主干:

练习4

Any deviation from the approved design should be recorded in the inspection report.

  • 主语:
  • 谓语:
  • from the approved design修饰:
  • in the inspection report
  • 主干:

练习5|长一点

Before the repaired area is accepted, engineers should inspect the completed work and confirm that the repair complies with the approved design.

Before从句

  • 主语:
  • 谓语:
  • 语态:

主句

  • 主语:
  • 谓语1:
  • 宾语1:
  • 谓语2:
  • that是什么从句:
  • that从句主语:
  • 谓语:
  • 补足信息:

最短有意义主干:

工程逻辑:


⑥参考答案

答案

1

Engineers check the repair materials before starting the work.

  • 主语:Engineers
  • 谓语:check
  • 宾语:the repair materials
  • before starting the work:时间状语

主干:

Engineers check the repair materials.


2

  • 主语:The contractor
  • 谓语:should follow
  • 宾语:the approved repair procedure
  • approved:修饰 repair procedure

主干:

The contractor should follow the repair procedure.


3

主语:

Repair materials

定语从句:

that do not comply with the specification

  • that = repair materials
  • 谓语:do not comply
  • with the specificationcomply 必需的介词补足信息

主句:

should not be used

推荐主干:

Materials that do not comply with the specification should not be used.

这里不要压成:

Materials should not be used.

因为核心判断条件消失了。


4

主语:

Any deviation

谓语:

should be recorded

from the approved design

修饰 deviation

in the inspection report

地点/记录载体信息

推荐:

Any deviation from the design should be recorded.


5

Before从句:

the repaired area / is accepted

被动语态。

主句:

engineers
should inspect / the completed work
and confirm / that…

that从句:

the repair / complies / with the approved design

推荐主干:

Engineers should inspect the repair and confirm that it complies with the design.

工程逻辑:

完工
→ 检查
→ 验证符合设计
→ 接受维修成果


⑦ Grammar|before / after + V-ing

结构1

before + V-ing

当两个动作的主语相同时,很常见:

Engineers assess the damage before selecting a repair method.

两个动作都是:

engineers assess
engineers select

所以第二个主语可以省:

before selecting


结构2

before + 主语 + 谓语

如果需要明确另一件事:

Before repair work begins, engineers should check the materials.

这里:

repair work / begins

是完整从句。


after同理

After completing the repair, engineers inspect the area.

主语都是 engineers。

也可以:

After the repair is completed, engineers inspect the area.


6题

选择正确形式。

1

Engineers check the materials before ___ the repair.

A. starting
B. start

2

Before the repair ___, all materials should be checked.

A. begins
B. beginning

3

Engineers inspect the area after ___ the repair.

A. completing
B. complete

4

After the repair ___ completed, the area should be inspected.

A. is
B. being

5

The contractor should review the drawings before ___ work.

A. commencing
B. commence

6

Before work ___, the approved procedure should be confirmed.

A. starts
B. starting

答案

答案:

1A / 2A / 3A / 4A / 5A / 6A


⑧ 主动 / 被动|5题

1

Engineers inspect the completed repair.

答案

✅ 主动

2

The completed repair is inspected by engineers.

答案

✅ 被动

3

Any deviation should record in the report.

答案

Any deviation should be recorded in the report.

4

The contractor should follow the approved procedure.

答案

✅ 主动

5

The repair materials must check before use.

答案

The repair materials must be checked before use.


⑨ 阅读|20~25分钟

Quality Control During Repair Work

Repair work should be carried out in accordance with the approved design and repair procedure. Before work begins, engineers should confirm that the proposed materials and construction methods are suitable for the intended repair.

Quality control should continue throughout the repair process. Materials, workmanship, dimensions, surface preparation, and installation procedures may all affect the performance of the completed repair.

Any significant deviation from the approved design should be recorded and assessed. Where a deviation may affect structural performance, engineers should determine whether the repair proposal needs to be revised.

After the repair is completed, the repaired area should be inspected. The final inspection should confirm that the work has been completed satisfactorily and that the repaired area is consistent with the approved design.


⑩ 段意|8分钟

P1

approved design / materials / methods

核心:

施工前确认材料和施工方法符合批准方案。

P2

quality control / workmanship / installation

核心:

施工全过程需要质量控制。

P3

deviation / assess / revise

核心:

明显偏差需要记录、评估,必要时修改方案。

P4

final inspection / satisfactorily / approved design

核心:

完工后检查维修结果是否符合要求。

最后关掉文章:

恢复 2个段意 就合格。


⑪ 长难句

Where a deviation may affect structural performance, engineers should determine whether the repair proposal needs to be revised.

先看结构。

Where从句

a deviation / may affect / structural performance

这里 where

在……情况下


主句

engineers / should determine / whether…

whether从句:

the repair proposal / needs to be revised

注意:

needs to be revised

= 需要被修改


主干

Engineers should determine whether the proposal needs revision.

自然中文:

如果某项偏差可能影响结构性能,工程师应判断维修方案是否需要修改。


⑫ 阅读题

英文回答。

  1. What should repair work be carried out in accordance with?
  2. What should engineers confirm before work begins?
  3. What factors may affect the performance of the completed repair?
  4. What should happen to significant deviations from the approved design?
  5. What should engineers do if a deviation may affect structural performance?
  6. What should the final inspection confirm?

⑬ Rewrite

1

主动 → 被动

Engineers inspect the repaired area after completion.


2

自然改写,使用 comply with

The repair work should be consistent with the approved design.


⑭ Writing|10分钟

任务一|纠错

  1. Repair work should follow the approved procedure.
  2. Any significant deviation should be record.
  3. Engineers should confirms the repair quality.
  4. Materials must be checked before use.
  5. The repair proposal may need to be revised.

任务二|because

Quality control is important because ______.

参考

参考方向:

poor workmanship may affect the long-term performance of the repair.


任务三|before

Engineers should check the repair materials before ______.

参考

参考:

starting the work.


⑮ Shadowing|15分钟

今天开始加入自然语流标注

句子比昨天短。


Sentence 1

第一句

Repair work should follow the approved method.

说明

意群

Repair work / should follow / the approved method.

重音

rePAIR WORK / should FOLlow / approved METHOD

自然语流

work should

/k/ + /ʃ/

work末尾 /k//ʃ/ 前通常不会很重地爆出来,可以做不完全爆破

work̚ should

不要:

WORK-KUH SHOULD


approved method

/d/ + /m/

approved末尾 /d//m/d通常轻收住,不要额外加元音:

approved̚ method


Sentence 2

第二句

Materials should be checked before use.

说明

意群

Materials / should be checked / before use.

重音

maTERials / CHECKED / USE

弱读

should 非强调时可以比较轻:

/ʃəd/ 或较弱的 /ʃʊd/

不要每次都重读 SHOULD。

checked before

/t/ + /b/

两个辅音相邻,checked末尾 /t/ 通常不完全爆破:

checked̚ before


Sentence 3

第三句

Any deviation should be recorded in the report.

说明

意群

Any deviation / should be recorded / in the report.

重音

deviAtion / reCORDed / rePORT

recorded in

这里后面是元音 /ɪ/

recorded‿in

末尾 /d/ 可以自然连接到:

in

不要停顿:

recorded / in ❌


in the

the 在辅音前通常弱读:

the /ðə/

所以整体:

in the report

不要每个词都一样重。


Sentence 4

第四句

Engineers inspect the repair after completion.

说明

意群

Engineers / inspect the repair / after completion.

重音

engiNEERS / inSPECT / rePAIR / comPLEtion

inspect the

/t/ + /ð/

inspect末尾 /t/the/ð/t通常不会强爆破:

inspect̚ the

repair after

这里澳音是非卷舌音,但 repair 后面紧跟元音开头 after,可能出现自然的 linking r(连读r)

repair‿after

听感会比单独读 repair 更连。

这也是澳音/英音里很值得熟悉的现象。


Shadowing流程

每句:

  1. 看稿 + 听 1~2遍
  2. 看稿跟读 3遍
  3. 不看稿跟读 2~3遍
  4. 最后关闭文字和声音
  5. 只做一次提取

记录:

关键词:___/4
主干:___/4
基本完整:___/4
直接英文:___/4

Day43目标

关键词 ≥ 3/4

主干 ≥ 2/4

完整句不是今天重点。


⑯ RA|5分钟

一次录完:

Quality control should continue throughout the repair process. Materials and workmanship can affect the long-term performance of the completed repair. Any significant deviation should be recorded and assessed.

不要重录。


⑰ RS|6句

今天继续短句。

1

第一句

Engineers inspect the repair work.

慢速:

常速:

2

第二句

Materials should be checked before use.

慢速:

常速:

3

第三句

Quality control is essential.

慢速:

常速:

4

第四句

Any deviation should be recorded.

慢速:

常速:

5

第五句

The repair must comply with the design.

慢速:

常速:

6

第六句

Engineers verify the quality of the completed work.

慢速:

常速:

规则:

一遍完整 → 马上完整复述

不完整才:

英文残留词 → 主干

记录:

单遍完整:___/6
未完整:___句
主干救回:___/___
完整中文中转:___/6
学习后完整:___/6

⑱ Speaking|10分钟

今天也降一点难度。

1

engineers / inspect / repair

主干

先:

Engineers inspect the repair.

完整

再扩:

Engineers inspect the completed repair.


2

materials / comply / specification

主干

Materials should comply with the specification.

完整

再扩:

Repair materials should comply with the approved specification.


3

deviation / record

主干

A deviation should be recorded.

完整

扩:

Any significant deviation should be recorded.


4

workmanship / affect / performance

主干

Workmanship can affect performance.

完整

扩:

Poor workmanship can affect repair performance.

记录:

主干:___/4
完整扩展:___/4
直接英文:___/4

今天:

主干3/4

比完整扩展更重要。


⑲ Day43 工程词汇

A级|核心必会

1. quality control

质量控制

搭配:

  • quality control procedure — 质量控制程序
  • quality control inspection — 质量检查
  • maintain quality control — 保持质量控制

例句:

Quality control should continue throughout the repair process.


2. workmanship

施工质量;工艺质量

工程里不是:

“工人的工作”

而是:

施工做得好不好

例如:

poor workmanship — 施工质量差

good workmanship — 良好施工质量


3. comply with the specification

符合规范 / 技术要求

一定记:

comply with

不是:

comply specification ❌

例句:

Repair materials should comply with the specification.


4. deviation from the design

与设计的偏差 / 偏离设计

搭配:

  • significant deviation
  • design deviation
  • deviation from the approved design
  • record a deviation

5. approved repair procedure

批准的维修施工程序

搭配:

  • follow the approved procedure
  • approved repair method
  • approved design
  • construction procedure

B级

long-term performance

长期性能

completed repair

已完成的维修工程 / 修复区域

surface preparation

表面处理

在混凝土修补、钢结构防腐和粘结施工里都很常见。


C级

  • satisfactorily — 令人满意地 / 符合要求地
  • installation — 安装
  • compliance — 符合性
  • intended — 预期的