Engineers assess the severity of each identified defect.
填写:
主语:
谓语:
宾语:
修饰severity:
修饰defect:
主干:
练习2
Critical defects usually receive a higher repair priority.
填写:
主语:
谓语:
宾语:
修饰defects:
修饰priority:
副词:
主干:
练习3
Engineers should consider both the likelihood and consequences of structural failure.
填写:
主语:
谓语:
宾语:
both...and...连接的两个部分:
修饰likelihood / consequences:
主干:
练习4
A high-risk defect is one that requires urgent attention.
填写:
主语:
谓语:
表语:
that是什么从句:
that从句主语:
that从句谓语:
that从句宾语:
主干:
练习5|长句
If a defect presents an unacceptable risk to structural safety, engineers should prioritise the repair and determine which remedial measures are most appropriate.
填写:
If从句主语:
If从句谓语:
If从句宾语:
修饰risk:
主句:
主语:
谓语1:
宾语1:
谓语2:
宾语2类型:
which从句:
主语:
谓语:
表语:
最短有意义主干:
整句逻辑:
参考答案
⑥参考答案
1
主语:Engineers
谓语:assess
宾语:the severity
修饰severity:of each identified defect
修饰defect:identified
主干:
Engineers assess severity.
2
主语:Critical defects
谓语:receive
宾语:a higher repair priority
修饰defects:critical
修饰priority:higher / repair
副词:usually
主干:
Defects receive priority.
3
Engineers should consider both the likelihood and consequences of structural failure.
主语:Engineers
谓语:should consider
宾语:both the likelihood and consequences of structural failure
并列:
the likelihood and consequences
共同修饰:
of structural failure
推荐主干:
Engineers should consider likelihood and consequences.
不要压成:
Engineers should consider. ❌
4
A high-risk defect is one that requires urgent attention.
主语:A high-risk defect
谓语:is
表语:one
that requires urgent attention:定语从句,修饰one
that从句:
主语:that = one
谓语:requires
宾语:urgent attention
主干:
A defect is one that requires attention.
更自然理解:
A high-risk defect requires urgent attention.
5
If从句:
主语:a defect
谓语:presents
宾语:an unacceptable risk
修饰risk:to structural safety
主句:
主语:engineers
谓语1:should prioritise
宾语1:the repair
谓语2:determine
宾语2:which宾语从句
which从句:
which remedial measures are most appropriate
主语:which remedial measures
谓语:are
表语:most appropriate
推荐主干:
Engineers should prioritise the repair and determine the appropriate measures.
逻辑:
风险不可接受 → 提高维修优先级 → 确定适当整改措施
⑦ Grammar|have to / must / need to
昨天练了:
may / should / must
今天补三个工程里很常见的表达。
must
强制、明确要求:
Critical defects must be repaired.
have to
因为实际条件或外部要求“不得不、必须”。
The contractor has to complete the repair before handover.
need to
表示客观需要:
Engineers need to assess the risk.
通常比must柔和。
练习6题
选择最自然:
must / have to / need to
1
Engineers ___ assess the condition before recommending repairs.
2
Critical safety defects ___ be addressed immediately.
3
The contractor ___ complete the work before the agreed handover date.
4
Engineers ___ understand the cause before selecting a repair method.
5
All temporary supports ___ remain in place until approval is given.
6
The inspection team ___ return tomorrow because access is unavailable today.
参考
参考:
need to
must
has to
need to
must
has to
⑧ 主动 / 被动|5题
判断正确/错误 + 主动/被动。
1
Engineers should prioritise high-risk defects.
2
High-risk defects should be prioritised.
3
Immediate repair may be require.
4
The risk must be assessed carefully.
5
Engineers must be determine the repair priority.
答案
答案:
✅ 主动
✅ 被动
❌
Immediate repair may be required.
✅ 被动
❌
Engineers must determine the repair priority.
继续强化:
modal + do
和:
modal + be + done
⑨ 阅读|25分钟
Repair Prioritisation and Risk Assessment
Structural defects should not be prioritised only according to their visible size. A small defect may still require urgent attention if it affects a critical structural component or presents a significant safety risk.
Engineers normally consider both the likelihood and consequences of failure. A condition that is unlikely to fail but would have severe consequences may still require a high repair priority. Similarly, a defect with a high likelihood of deterioration may require early intervention even if its current effect is limited.
Repair priority should therefore reflect the overall level of risk rather than a single observation. Engineers may consider defect severity, rate of change, affected structural elements, exposure conditions, and the possible consequences of further deterioration.
High-risk conditions should be addressed promptly. Lower-risk defects may be monitored or included in a planned maintenance programme. The selected response should be appropriate to both the current condition and the expected future behaviour of the structure.
⑩ 段落概括|8分钟
自己先概括。
参考:
P1
不能只根据缺陷表面大小决定维修优先级。
关键词:
visible size / critical component / safety risk
P2
风险判断需要同时考虑失效可能性和失效后果。
关键词:
likelihood / consequences / priority
P3
维修优先级应反映总体风险水平。
关键词:
overall risk / severity / rate of change
P4
高风险问题及时处理,低风险问题可以监测或计划维护。
关键词:
high risk / promptly / monitoring
最后只要求闭眼恢复:
2个段意
⑪ 长难句
今日句:
A condition that is unlikely to fail but would have severe consequences may still require a high repair priority.
先不要看下面解析,自己拆。
主句主语
A condition that is unlikely to fail but would have severe consequences
中心词:
condition
定语从句
that is unlikely to fail but would have severe consequences
修饰:
condition
里面两个并列部分:
is unlikely to fail
和:
would have severe consequences
主句谓语
may require
主句宾语
a high repair priority
最短主干:
A condition may require a high priority.
自然翻译:
即使某种状况发生失效的可能性较低,但如果失效后果严重,它仍可能需要较高的维修优先级。
⑫ 阅读题 Part A
Q1
Why should defects not be prioritised only according to their visible size?
Q2
What two main factors do engineers normally consider when assessing failure risk?
Q3
Why may a condition with a low likelihood of failure still require a high repair priority?
Q4
What factors may engineers consider when determining overall risk?
Q5
How should high-risk conditions be treated?
Q6
What may be done with lower-risk defects?
⑬ Rewrite|2题
1
Engineers assess the risk carefully.
改被动:
The risk…
2
High-risk conditions require prompt attention.
改成被动含义表达:
Prompt attention…
参考
参考:
The risk is assessed carefully by engineers.
更自然:
The risk is assessed carefully.
第二句:
Prompt attention is required for high-risk conditions.
⑭ Writing|12分钟
任务一:纠错
Engineers should consider the possible consequences of failure.
Critical defects must addressed immediately.
A minor defect may still present a significant risk.
Engineers need to assesses the rate of deterioration.
Lower-risk defects may be monitored.
先自己做。
答案
答案:
正确
Critical defects must be addressed immediately.
正确
Engineers need to assess the rate of deterioration.
正确
任务二:because
完成:
A small defect may still require urgent attention because ______.
参考
参考:
A small defect may still require urgent attention because it may affect a critical structural component.
任务三:while
合并:
High-risk defects require prompt action. Lower-risk defects may be monitored.
参考
参考:
High-risk defects require prompt action, while lower-risk defects may be monitored.
⑮ Shadowing|20分钟
四句:
第一句
Engineers assess the severity of each defect.
第二句
High-risk defects should receive a higher repair priority.
第三句
The consequences of structural failure may be severe.
第四句
Lower-risk defects may be monitored as part of planned maintenance.
汇总:
流程保持不变:
3分钟
看稿 + 听
5分钟
看稿Shadowing
8分钟
不看稿Shadowing
4分钟
关键词 → 主干 → 完整句
记录:
关键词:___/4
主干:___/4
完整:___/4
直接英文:___/4
今天目标:
关键词4/4
主干3~4/4
完整3/4
直接英文1~2/4
⑯ RA|8分钟
一遍录音:
Engineers assess repair priorities according to the overall level of structural risk. Both the likelihood and consequences of failure should be considered when deciding whether immediate intervention is necessary.
重点:
priorities
according
structural
likelihood
consequences
failure
intervention
necessary
⑰ RS|6句
第一句
Engineers assess structural risk.
慢速:
常速:
第二句
Serious defects receive higher priority.
慢速:
常速:
第三句
Failure may have severe consequences.
慢速:
常速:
第四句
Critical defects require urgent attention.
慢速:
常速:
第五句
Lower-risk defects may be monitored.
慢速:
常速:
第六句
Engineers should determine the appropriate action.